翻訳と辞書
Words near each other
・ British Rail Class 139
・ British Rail Class 14
・ British Rail Class 140
・ British Rail Class 141
・ British Rail Class 142
・ British Rail Class 143
・ British Rail Class 144
・ British Rail Class 15
・ British Rail Class 150
・ British Rail Class 151
・ British Rail Class 153
・ British Rail Class 155
・ British Rail Class 156
・ British Rail Class 157
・ British Rail Class 158
British Rail Class 159
・ British Rail Class 16
・ British Rail Class 165
・ British Rail Class 166
・ British Rail Class 168
・ British Rail Class 17
・ British Rail Class 170
・ British Rail Class 171
・ British Rail Class 172
・ British Rail Class 175
・ British Rail Class 180
・ British Rail Class 185
・ British Rail Class 20
・ British Rail Class 201
・ British Rail Class 202


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

British Rail Class 159 : ウィキペディア英語版
British Rail Class 159

The Class 159 is a class of British diesel multiple-unit trains of the Sprinter family, built in 1989–1992 by BREL at the Derby Carriage and Wagon Works as Class 158. Before entering traffic, the original 22 units were modified at Rosyth Dockyard to Class 159 to operate express services from London Waterloo to Exeter and replace locomotive-hauled passenger trains.
The units are known and were originally branded by Network SouthEast as South Western Turbo.〔 〕〔(South Western Turbo Destination Codes. )〕
==History and design==

In the late 1980s, the locomotive-hauled stock on Network SouthEast's ''West of England'' route from London Waterloo to Salisbury, Yeovil, Bristol, Bath and Exeter was in urgent need of replacement. The British Rail Class 50 locomotives were not suited to the stop-start nature of the route, and frequently broke down. Because of the long sections of single track west of Salisbury following the Beeching Axe, a single breakdown could cause chaos. Various options were considered including electrification, shortened HSTs, construction of new locomotives and stock (a passenger version of the proposed Class 48), or the proposed Class 171 (an intercity version of the Class 165 – not to be confused with the later Turbostars). A study found the best options were electrification or new DMUs.〔
With the UK economy in decline in the early 1990s, it was found that Regional Railways had over-ordered Class 158s at the same time as Network SouthEast was looking for a similar number of new diesel trains. NSE agreed to take on the surplus Class 158s.
The original 22 units were built as Class 158 units, but were rebuilt by Babcock Rail in Rosyth Dockyard before entering traffic. This entailed fitting first-class accommodation and retention toilets, and various other modifications. The rebuild was required because it was not possible for Network SouthEast and the newly privatised BREL to agree terms on the variation order to NSE specification.〔(Southern E-Group article ) (retrieved 3 September 2007)〕
The first unit (159004) was handed over to NSE on 6 January 1993.〔
The 1992–1993-build units are numbered 159001-022, with individual cars numbered 52873-894 and 57873-894 for driving motor vehicles, and 58718-739 for intermediate motor vehicles. The entire class is maintained at a purpose-built depot at Salisbury.〔(Class 159 Fleetlist showing unit formations ). Retrieved 3 September 2007.〕〔
In 2007, eight further Class 159 units were created through the rebuilding of surplus Class 158 units displaced from TransPennine Express.
All units use P4-4A and T4-4A bogies.
The units feature BSI couplers. This enables them to work in multiple with and units, as well as units of the same class.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「British Rail Class 159」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.